|
Lea Crest was built at Ledgard Bridge in 2003 for David & Pamela Ross. She is a 45ft x 14ft broad beam with a rear wheelhouse, after a short period cruising the broad canals of the north of England she was shipped to France.
You can view David & Pamela’s diary from the button at the top of this page.
|